High Discharge Pressure Benmore
[ BEN-067 / FLT-19 ]
UNITS: 3

HIGH DISCHARGE PRESSURE
IN BENMORE.

System cuts out on high pressure, discharge line too hot to touch, poor cooling. REYDS engineers are on standby in Benmore for immediate high discharge pressure recovery.

069 268 0988 012 546 6670
[ BEN-067 / FLT-19 DIAGNOSIS ]

High Discharge Pressure — Benmore recovery protocol.

CAUSE ANALYSIS — BENMORE

  • 01Restricted condenser airflow
  • 02Overcharged system
  • 03Non-condensables in the circuit
  • 04Fan cycling control failure
  • 05Recirculated hot air in the plant area

RECOVERY PROTOCOL — BENMORE

  • 01Discharge and suction pressure analysis
  • 02Condenser airflow and fan check
  • 03Charge verification by weight
  • 04System evacuation to remove non-condensables
  • 05Head pressure control repair
  • 06Plant-room ventilation correction
ZONE
Benmore
SEVERITY
HIGH
RESPONSE
90 min
AVAILABILITY
24/7
[ BEN-067 RELATED FAULTS ]

Other recovery services in Benmore.

[ ADJACENT ZONES ]

High Discharge Pressure — nearby zones.

24/7 STANDBY