High Discharge Pressure Hurlingham
[ HUR-042 / FLT-19 ]
UNITS: 2

HIGH DISCHARGE PRESSURE
IN HURLINGHAM.

System cuts out on high pressure, discharge line too hot to touch, poor cooling. REYDS engineers are on standby in Hurlingham for immediate high discharge pressure recovery.

069 268 0988 012 546 6670
[ HUR-042 / FLT-19 DIAGNOSIS ]

High Discharge Pressure — Hurlingham recovery protocol.

CAUSE ANALYSIS — HURLINGHAM

  • 01Restricted condenser airflow
  • 02Overcharged system
  • 03Non-condensables in the circuit
  • 04Fan cycling control failure
  • 05Recirculated hot air in the plant area

RECOVERY PROTOCOL — HURLINGHAM

  • 01Discharge and suction pressure analysis
  • 02Condenser airflow and fan check
  • 03Charge verification by weight
  • 04System evacuation to remove non-condensables
  • 05Head pressure control repair
  • 06Plant-room ventilation correction
ZONE
Hurlingham
SEVERITY
HIGH
RESPONSE
90 min
AVAILABILITY
24/7
[ HUR-042 RELATED FAULTS ]

Other recovery services in Hurlingham.

[ ADJACENT ZONES ]

High Discharge Pressure — nearby zones.

24/7 STANDBY